How it works

Replace your compliance spreadsheet, step by step

The real workflow, screen by screen: from adding a packaging SKU to reading a single readiness score instead of five open spreadsheet tabs.

1

Add a packaging SKU

The spreadsheet way

One row per SKU, one tab per market, formulas that break when someone inserts a column. No single place shows which SKUs are missing the data you'll need later.

With PPWRsolution

Add the SKU code, packaging type, volume, and per-component material data once. AI can extract values straight from a supplier spec sheet PDF instead of retyping them.

PPWRsolution packaging SKU list showing SKU code, name, type, and compliance grade
2

Generate a Declaration of Conformity

The spreadsheet way

A DoC tracker tab with a 'done?' column you update from memory. Nothing flags a new SKU that shipped without one.

With PPWRsolution

Every SKU without a linked Declaration of Conformity shows up automatically in the readiness report, before it becomes an audit finding. Since 12 Aug 2026 every unit placed on the EU market needs one (Art. 39).

PPWRsolution declarations list showing a Declaration of Conformity with document number, issue date, and review date
3

Register EPR in every market you sell in

The spreadsheet way

A market-by-market checklist, one deadline column per scheme, chased manually across Ecoembes, Citeo, LUCID, CONAI, and whoever else applies.

With PPWRsolution

One table: every market's EPR status, scheme, registration number, and next declaration due date, side by side.

PPWRsolution EPR registrations table showing country, scheme, status, and next declaration due date
4

Check SDDR scope (Spain deposit-return)

The spreadsheet way

A guess at which SKUs count as covered containers, based on someone's memory of the volume rules.

With PPWRsolution

SKUs are matched against SDDR eligibility rules automatically by packaging type, volume, and material, and flagged when volume data is missing so the scope check isn't silently wrong.

PPWRsolution SDDR page showing workspace status and SKUs likely in SDDR scope
5

See the IEEPNR tax estimate

The spreadsheet way

A manual €0.45/kg calculation redone by hand every quarter before the Modelo 592 filing window, redone again whenever a formula gets copied wrong.

With PPWRsolution

A per-SKU non-recycled-content tax estimate, recalculated automatically as weight or recycled-content data changes.

PPWRsolution IEEPNR tax estimate table showing SKU code, name, components, and estimated tax per unit
6

Read your readiness report

The spreadsheet way

No single view. You'd have to open five tabs, and cross-check them by hand, to know if you're actually ready.

With PPWRsolution

One score, one page: what's compliant, what's a real gap, and what's just missing data, so you know which is which before an auditor does.

PPWRsolution readiness report showing a PPWR readiness score, compliance axes, top priorities, and data gaps blocking the assessment

See it on your own SKUs

Start free, add a few SKUs, and see your own readiness score instead of an open spreadsheet.

Start free assessment